Out For Tender › Vereinigte Staaten › Bauarbeiten
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
- Auftraggeber
- FA8137 AFSC PZIOC, Dept of Defense
- Land
- Vereinigte Staaten
- Kategorie
- Bauarbeiten
- Frist
- Endet in 4 Tagen (16 Nov 2026 13:00 UTC-6)
- Veröffentlicht
- 3 Nov 2026
- Verfahren
- Solicitation - Small Business Set Aside - Partial
Offizielle Bekanntmachung lesen und bieten → Die Angebotsabgabe erfolgt immer auf dem Portal des Auftraggebers, niemals hier.
Was der Auftraggeber sucht
October 22, 2026 Please see amendment 0006 attached. Complete RFI responses and documents will be posted at a later date. October 7, 2026 The government is still working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 28 October, 2026, while the government finalizes documents. September 23, 2026 The government is sitll working through RFI followup responses and the subsequent amendment. This amendment adjusts the proposal due date to 13 October, 2026, while the government finalizes documents. September 16, 2026 Complete RFI responses posted. Followup questions related to these RFIs can be submitted by September 21 at noon CST. The government is not accepting new questions. Any question submitted must be tied to an answer provided in the attachment. The proposal due date will remain unchanged but the government will continue to monitor the need to extend. September 10, 2026 It was brought to the government's attention that previous solicitation amendments cannot be accessed. They now have been activated and are accessible. September 3, 2026 Amendment posted with updated Proposal due date, please see attachment. The government is still working to answer all RFIs. August 25, 2026: See attachment for a complete list of RFIs received to date. Some have already been answered, and the government is working to answer the rest. The government will continue to evaluate the need to extend the proposal deadline based on the time required to answer all questions and supply those answers to industry. August 19 2026: Please see amendment 0002 attached and an updated Section L. August 11 2026: 1. Please see amendment 0001 attached and an updated Section L dated 5 August 2026. 2. The government is accepting RFIs until 21 August at 3PM EDT. If you have already sent your RFIs to the POCs you do not have to resubmit them. 4 August 2026: Please see the attached RFP (FA8137-26-R-0040) and all attachments. --------------------------------------------------------------------------------------------------------------- THIS POSTING WILL SATISFY THE REQUIREMENT OF RFO 5.101, Presolicitation Multiple Award Construction Contract (MACC) for General Construction Services will accomplish a broad range of sustainment, maintenance, repair, alteration/renovation, and minor construction projects affecting real property facilities at Tinker Air Force Base, Oklahoma. The work performed will be complex in nature, require multiple construction trades, and may require engineering design performed by credentialed professionals. Project execution methods will fall into one of the following classifications. The execution method will be defined in the project documents for each Task Order (TO) under this Indefinite Delivery Indefinite Quanity (IDIQ) contract. Design Build will include the Contractor providing both the design and construction services for a project; during the Design-Build process, final design solutions are provided by the Contractor, not the Government. The Government will provide a Statement of Work (SOW), drawings, and other preliminary documents to establish requirements from the work to be completed. These documents will be equivalent to a schematic 15% or greater design. When awarded the TO for the project, the Contractor will complete the design to the 100% level to include drawings, specifications, design analysis/narrative, and other documentation as required by the Government. Construction with Limited Design method will include the Government providing the design and the Contractor will further develop portions as required and will provide construction services for the project. This method will be used for non-complex or repetitive work types of projects where design cost and effort is not warranted. The Government will provide the SOW, drawings, and other documents as necessary to establish requirements to complete the project. These documents will be equivalent to a design…
Sprache dieser Bekanntmachung: English. Titel und Beschreibung erscheinen genau so, wie der Auftraggeber sie veröffentlicht hat.
How this compares
- This is one of 996 open tenders in Vereinigte Staaten for Bauarbeiten.
- Bidders were given 13 days from publication to the deadline; the median for open tenders in Vereinigte Staaten is 18 days.
More open tenders from this buyer
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
FA8137 AFSC PZIOC, Dept of Defense
WWYK260004 - REPAIR STRUCTURAL INTEGRITY, B1134, POST 34 & NORTH WALL
FA8137 AFSC PZIOC, Dept of Defense
WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19
FA8137 AFSC PZIOC, Dept of Defense
2-STEP SEALED BID - TINKER AFB WWYK250019 Remove and Replace Fire Sprinkler in Plasma Booth Dust Collectors and Replace the Building F/A System, B3221
FA8137 AFSC PZIOC, Dept of Defense
Similar open tenders
Z--Irrigation Canal Lining Maintenance and Repair for Colorado Rive - Irrigation
WESTERN REGION, Interior, Department of the
Y--LB Lateral Water Line and Facilities Replacement for Wastewater System
RECLAMATION CONTRACTING ACTIVITY, Interior, Department of the
Progressive Design Build - 26,000 SF hangar at Lakehurst on Joint Base McGuire-Dix-Lakehurst (JBMDL).
W2SD ENDIST NEW YORK, Dept of Defense
Progressive Design Build - 26,000 SF hangar at Lakehurst on Joint Base McGuire-Dix-Lakehurst (JBMDL).
W2SD ENDIST NEW YORK, Dept of Defense
JP Murtha Float Mooring Bitts Retrofit
W072 ENDIST PITTSBURGH, Dept of Defense
Source: SAM · reference FA8137-26-R-0040 · JSON