Out For Tender › Vereinigte Staaten › Bauarbeiten
Grand Island Mitigation Site
This tender has closed. It stays online as a record of what was advertised.
- Auftraggeber
- W075 ENDIST SACRAMENTO, Dept of Defense
- Land
- Vereinigte Staaten
- Kategorie
- Bauarbeiten
- Frist
- Beendet (27 Oct 2026 11:00 UTC-7)
- Veröffentlicht
- 8 Oct 2026
- Verfahren
- Sources Sought
Offizielle Bekanntmachung lesen und bieten → Die Angebotsabgabe erfolgt immer auf dem Portal des Auftraggebers, niemals hier.
Was der Auftraggeber sucht
SOURCES SOUGHT NOTICE Project Description: Grand Island Mitigation Project Anticipated Posting Date: 09 October 2026 Sources Sought Number: W9123827X1CQX SAM Posting Title: USACE SPK DBB Construction Grand Island Mitigation Project Sacramento, California SAM Posting Description: This Sources Sought Notice is being issued for market research purposes to determine the availability, capability, and interest of small business firms for a potential Government requirement. NO SOLICITATION IS AVAILABLE; requests for a solicitation will go unanswered. No award will be made from this Notice. Responses will be used to determine potential acquisition strategies, understand current market capabilities, and to gain knowledge of potential sources. GENERAL SCOPE: The Sacramento River Grand Island Mitigation Project is a restoration initiative on a 233-acre site located at the western tip of Grand Island in Sacramento County, California, situated at the confluence of the Sacramento River, Steamboat Slough, and Cache Slough. The project is designed to create and enhance approximately 84 acres of self-sustaining aquatic and riparian habitat as compensatory mitigation for the American River Common Features (ARCF) project. The construction scope entails approximately 108,000 cubic yards of total excavation to establish a tidal channel network and create an interior "habitat bowl" with islands and peninsulas, alongside breaching an existing berm to connect the site to Steamboat Slough. Excavated material will be utilized to construct on-site features such as the islands and peninsulas, while the remaining excess material will initially be placed in designated uncompacted fill areas on the island and, if settlement issues arise, hauled off-site by barge. To support the federally listed Western, Yellow-Billed Cuckoo, the revegetation plan establishes a continuous riparian corridor by planting water-tolerant trees and shrubs at lower elevations, transitioning to diverse, later-successional trees and native grasses at higher elevations. Project features also include protecting the Valley Elderberry Longhorn Beetle by transplanting impacted elderberry shrubs to designated on-site areas, followed by irrigation and maintenance of these transplants for the duration of this contract. To stabilize the breach, the design utilizes a hybrid bioengineered approach featuring a quarry stone riprap toe from the channel inverted up to 4 feet, transitioning to a bioengineered slope reinforced with erosion control fabrics and live willow cuttings above. Construction scheduling is subject to strict environmental windows, requiring all in-water work (such as activities in Steamboat Slough) to occur strictly between July 1st and October 31st. To isolate the breach work area from the active waterway during in-water construction, a temporary 250-foot-long steel sheet pile cofferdam must be installed and then fully removed upon project completion. The potential requirement may result in a firm-fixed-price solicitation issued approximately late November 2026. If solicited, the Government intends to award the anticipated requirement by mid-March 2027. The Government estimates that construction of the potential requirement can be completed within six hundred and sixty-five (665) calendar days from receipt of Notice to Proceed. If market conditions indicate this estimate may be unrealistic, respondents are encouraged to provide specific information (such as known equipment lead times or other timeline concerns) for Government consideration when responding to this Sources Sought Notice. The Government currently estimates the magnitude of construction for the potential project is between $15,000,000 and $20,000,000. The North American Industrial Classification System (NAICS) code for the potential requirement is anticipated to be 562910, Remediation Services. The small business size standard for the NAICS, as established by the U.S. Small Business Administration, is…
Sprache dieser Bekanntmachung: English. Titel und Beschreibung erscheinen genau so, wie der Auftraggeber sie veröffentlicht hat.
Source: SAM · reference W9123827X1CQX · JSON