Out For Tender › Eslovaquia › Máquinas, aparatos, equipo y productos consumibles eléctricos; iluminación
Implementation of Battery Energy Storage System at Čierny Váh
- Órgano de contratación
- Slovenské elektrárne, a.s.
- País
- Eslovaquia
- Categoría
- Máquinas, aparatos, equipo y productos consumibles eléctricos; iluminación
- Fecha límite
- Cierra en 29 días (26 Nov 2026 11:00 UTC+2)
- Publicada
- 27 Oct 2026
- Procedimiento
- Neg-w-call
- Código CPV
- 31440000
Leer el anuncio oficial y licitar → La presentación de ofertas se realiza siempre en el portal del órgano de contratación, nunca aquí.
Qué solicita el órgano de contratación
The subject matter of the tender comprises EPC performance of all supplies and services related to design and engineering, permitting and other engineering activities, transportation, installation, commissioning and putting into operation of the newly installed equipment. The principal scope of supply is the construction and commissioning of a Battery Energy Storage System (BESS) providing the following functions and services: • Frequency Containment Reserve (FCR); • automatic Frequency Restoration Reserve (aFRR); • market services, including Day-Ahead and Intraday market participation, energy arbitrage and imbalance management; • Limited Frequency Sensitive Mode – Overfrequency (LFSM-O) and Underfrequency (LFSM-U), providing active power response in the event of an increase or decrease in grid frequency; and • island operation to ensure the auxiliary power supply of the pumped-storage hydropower plant in the event of a loss of the 22 kV power supply. The BESS shall have a total usable energy capacity of at least 480 MWh and a rated power of at least 120 MW and shall be connected to the 400 kV substation via a newly constructed 400 kV bay. The scope of works includes all engineering and permitting activities, preparation of design documentation, civil, electrical and mechanical works, delivery and installation of battery containers, power conversion systems, energy management systems, transformers, switchgear and associated equipment. The contractor shall also ensure integration with existing plant systems, implementation of control, protection, monitoring and communication systems, fire protection and security systems, testing, commissioning, performance verification and training of operating personnel. The tenderer shall provide all documentation, certifications, inspections and services necessary to ensure safe, reliable and long-term operation of the BESS installation.
Idioma de este anuncio: slovenčina. El título y la descripción se muestran tal como los publicó el órgano de contratación.