Out For Tender

Out For Tender › Royaume-Uni › Travaux de construction

0661 Boars Head Footbridge Superstructure Renewal Works Contract 2026

Acheteur
Wigan Council
Pays
Royaume-Uni
Catégorie
Travaux de construction
Montant
£975k GBP
Date limite
Clôture dans 18 jours (20 Nov 2026 12:00 UTC+0)
Publié le
8 Oct 2026
Procédure
Open
Code CPV
45221112

Lire l'avis officiel et soumissionner → La soumission se fait toujours sur le portail de l'acheteur, jamais ici.

Ce que l'acheteur demande

Boars Head Footbridge is a three span simply supported steel structure, which carries the footbridge running parallel to the A5106 Chorley Road, over the West Coast Mainline railway line, in Wigan. The deck consists of an existing steel deck, supported by steel trestles located adjacent the up and down lines and bankseat abutments located in the embankments. All are located within the Network Rail Boundary. Wigan Council are seeking tier 1 Network Rail contractors to undertake the following works. The works are to remove the existing steel footbridge structure, refurbish the foundations and banking seats and install a new steel footbridge and supporting trestles. The work includes installing an ACO type drain to the West end of the bridge and minor regrading of the approaches at the East and West Entrances of the bridge. The reconstruction works briefly comprise: • Installing Traffic Management • Obtaining all necessary permits and possessions • Removing surfacing, street lighting and service box • Protecting services • Removing the existing steel footbridge and supports • Checking and making good the concrete surfaces to the trestles and bearing surfaces • Extending the existing seat structure • Install new bearing plates and removable deck plates • Install the new trestles and footbridge • Install new ACO drain run to West end, connecting into the existing surface water drain • Replace any kerbs disturbed during the works • Make good existing footpath surface • Remove traffic management The Contractor to provide all necessary transport, tools, access equipment, appropriate welfare, water disposal and clearance on completion in order to carry out the works effectively. We require full risk and method statements (RAMS) before commencement. The sites will be under control of CDM 2015.

Langue de cet avis : English. Le titre et la description sont affichés tels que publiés par l'acheteur.

How this compares

  • This is one of 194 open tenders in Royaume-Uni for Travaux de construction.
  • Its stated value is higher than 56% of the 187 open tenders in this category that state a value in GBP.
  • Bidders were given 43 days from publication to the deadline; the median for open tenders in Royaume-Uni is 30 days.

More open tenders from this buyer

Similar open tenders

Source: FTS · reference ocds-h6vhtk-0782bd · JSON