Out For Tender

Out For Tender › États-Unis › Travaux de construction

Progressive Design Build - 26,000 SF hangar at Lakehurst on Joint Base McGuire-Dix-Lakehurst (JBMDL).

Acheteur
W2SD ENDIST NEW YORK, Dept of Defense
Pays
États-Unis
Catégorie
Travaux de construction
Date limite
Clôture dans 8 jours (12 Nov 2026 02:00 UTC-5)
Publié le
2 Nov 2026
Procédure
Sources Sought

Lire l'avis officiel et soumissionner → La soumission se fait toujours sur le portail de l'acheteur, jamais ici.

Ce que l'acheteur demande

The U.S. Army Corps of Engineers (USACE), New York District, has a requirement for the design and construction of a new roughly 26,000 SF hangar at Lakehurst on Joint Base McGuire-Dix-Lakehurst (JBMDL). The project is anticipated to provide a permanent, secure, and efficiently configured Naval Secure Test and Research (NavSTAR) hangar to support aircraft compatibility testing at the Lakehurst test site on JBMDL. The Government is seeking industry feedback regarding the most effective means to plan, design, procure, construct, commission, and transition the new hangar. 1. NavSTAR Hangar Facility and Utility Systems New Hangar Facility: Construct a new permanent 25,172 SF footprint steel-frame hangar facility west of Bldg. 685 to support simultaneous 1-in/1-out fixed-wing carrier aircraft compatibility testing. Space includes several secure rooms that must be designed, built, and certified to the current ICD 705 standards with all appropriate secure network connections. Include a fully climate-controlled maintenance and testing bay, maintenance workshop, two (2) logistics warehouses, a payloads storage room, a security office, and dedicated support space for personnel. Ensure the facility incorporates high-performance and sustainable building design features maximizing energy efficiency in accordance with DoD Unified Facilities Criteria (UFC), federal laws, and Executive Orders to meet or exceed useful service life. Primary Power and Electrical Distribution: Provide a new 750 kW standby generator to supply emergency/backup power to the hangar facility and its secure testing operations. Provide complete primary and secondary electrical distribution systems, including transformers, apron lighting, and exterior security lighting. Integrate telecommunications infrastructure and secure communications lines directly with the existing installation network. Climate Control, Mechanical, and Fire Systems: Provide a fully climate-controlled HVAC system tailored for the maintenance/testing bay and personnel support areas, including dedicated environmental controls for secure operational zones. Provide potable water lines, sanitary sewer lines, natural gas piping, and a dedicated fire suppression system. Ensure all mechanical systems utilize life-cycle cost-effective, high-efficiency systems engineered for long-term utility-support operations. Commissioning, OMSI, and Post-Award Support: Provide complete system commissioning, cybersecurity feature testing, and operational validation. Develop and deliver Operations and Maintenance Support Information (OMSI) technical manuals to the Government. Provide Post Construction Award Services (PCAS) to support transition-to-operations. 2. Civil, Structural, and Site Infrastructure Site Preparation, Grading, and Drainage: Perform site clearing, excavation, and site preparation, including the possibility of 10,000 CY of bulk cut/fill earthwork. Implement a comprehensive storm water management facility incorporating Low Impact Development (LID) design elements to control runoff and protect local ecosystems. Foundations and Structural Systems: Construct a structural steel-frame building super-structure utilizing a built-up roofing assembly. Provide a spread footing reinforced concrete foundation engineered to mitigate local soil bearing and settlement risks. Paving and Site Access Improvements: Construct a dedicated fixed-wing taxiway to connect the hangar with the adjacent catapult system on the test runway. Construct a rotary-wing parking apron, a hangar access apron, and organizational vehicle parking. Construct dedicated concrete and asphalt access roads, including curbs, grading, and sidewalks, connecting the facility directly to the existing base road network via Deweese Road and E. Clubhouse Lake Road. 3. Utility Connections, Interfaces, and Cutover Work Existing Utility Interfaces: Connect the new facility to existing base potable water, sanitary sewer, natural gas, electrical,…

Langue de cet avis : English. Le titre et la description sont affichés tels que publiés par l'acheteur.

How this compares

  • This is one of 923 open tenders in États-Unis for Travaux de construction.
  • Bidders were given 9 days from publication to the deadline; the median for open tenders in États-Unis is 21 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference W912DS27S0005 · JSON