Out For Tender

Out For Tender › Stati Uniti › Servizi di riparazione e manutenzione

J045--FY27 Boilers Maintenance & Testing

Stazione appaltante
248-NETWORK CONTRACT OFFICE 8 (36C248), Veterans Affairs, Department of
Paese
Stati Uniti
Categoria
Servizi di riparazione e manutenzione
Scadenza
Scade tra 2 giorni (10 Nov 2026 10:00 UTC-4)
Pubblicata
6 Nov 2026
Procedura
Combined Synopsis/Solicitation - Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)

Leggi il bando ufficiale e partecipa → La presentazione delle offerte avviene sempre sul portale della stazione appaltante, mai qui.

Che cosa richiede la stazione appaltante

RFQ 36C24827Q0061 Amendment No. 1 This amendment is hereby issued to provide responses to questions and requests for information submitted by vendors, provide a revised PWS to address a correction on Boiler #2 description, as well as an updated Price/Cost Schedule reflecting the corrected description. Description of Boiler #2 contained on PWS and associated Line Items (LINs) of Price/Cost Schedule is hereby changed to read: Boiler Unit Number 2 (Local identifier): Fire tube steam boiler manufactured by York-Shipley; Serial number 96-19937-H-11618 The due date for Quote Submittal is changed from November 6, 2026, to November 10, 2026 at 10 AM AST. All other sections of the solicitation remain unchanged. RESPONSES TO QUESTIONS RECEIVED: Q1. Semiannual Safety-Device Testing: VHA Directive 1810, Appendix A, Section 2(a), establishes that safety devices requiring semiannual testing are ordinarily tested once annually by VA medical facility personnel and once annually by a qualified testing contractor, unless an alternative arrangement is approved. Does the Government require the contractor to perform both semiannual testing events under this solicitation? If so, has the alternative testing arrangement received the required approval? VACHS Boiler Plant personnel will perform the required semiannual safety-device testing. The Contractor shall perform the safety-device testing required under the PWS during its scheduled annual inspection and testing services. Q2. Monthly Safety Device Testing: PWS Section V(Q) includes safety-device tests for which the VHA Boiler and Associated Plant Safety Device Testing Manual establishes monthly testing frequencies, including primary and auxiliary low-water cutoffs, high- and low-water alarms, and the main flame-scanner flame-out test. Does the Government require the contractor to perform these tests monthly throughout the contract period, or will VACHS personnel continue performing the monthly tests while the contractor performs the scheduled maintenance and safety-device testing services? VACHS Boiler Plant personnel will perform the required monthly safety-device testing. Q3. Frequency of Nondestructive Testing, Component Replacement and Engineering Evaluations: PWS Sections V(I), V(L), V(U), V(V), and V(W) establish requirements involving component replacement, nondestructive testing (NDT), pressure-vessel inspections, and engineering evaluations, including ultrasonic thickness measurements, magnetic-particle examinations, and assessments of maximum allowable working pressure (MAWP) and remaining useful life. However, VHA Directive 1810, Appendix B, Table 2, establishes different inspection frequencies depending on the activity. For example, annual boiler inspections are required, whereas internal deaerator weld examinations using wet magnetic-particle testing are required at six-year intervals. Clarify the following: a. Nondestructive Testing: Are ultrasonic thickness measurements and magnetic-particle examinations required annually for each boiler and the deaerator, or are these examinations required only when indicated by inspection findings, equipment conditions, or established inspection intervals? The scope of this requirement applies to the Boilers only. b. Deaerator Weld Examination: Is the six-year internal deaerator weld examination required during the base contract period or any of the option years? If so, please identify the date of the most recent examination and the next scheduled examination. Not applicable. This service is cover under another service contract c. Engineering Evaluations: Are MAWP calculations, remaining-useful-life assessments, and deterioration-rate evaluations required annually for each boiler, deaerator, and condensate return tank, or only when inspection findings or equipment conditions warrant such evaluations? Not applicable. This service is not covered under this requirement. d. Component Replacement: Are component replacements identified in the PWS…

Lingua di questo bando: English. Titolo e descrizione sono mostrati esattamente come pubblicati dalla stazione appaltante.

How this compares

  • This is one of 502 open tenders in Stati Uniti for Servizi di riparazione e manutenzione.
  • Bidders were given 4 days from publication to the deadline; the median for open tenders in Stati Uniti is 17 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference 36C24827Q0061 · JSON