Out For Tender › Verenigd Koninkrijk › Structuren en materialen voor de bouw; ondersteunende producten voor de bouw (uitgezonderd elektrische apparatuur)
Manchester International Airport - Rail Footprint Civils
- Aanbestedende dienst
- Kier Transportation - CP7 NWC
- Land
- Verenigd Koninkrijk
- Categorie
- Structuren en materialen voor de bouw; ondersteunende producten voor de bouw (uitgezonderd elektrische apparatuur)
- Waarde
- £1m GBP
- Sluitingsdatum
- Sluit morgen (22 Oct 2026 09:00 UTC+1)
- Gepubliceerd
- 15 Oct 2026
- CPV-code
- 44114100
Lees de officiële aankondiging en schrijf in → Inschrijven gebeurt altijd op het portaal van de aanbestedende dienst, nooit hier.
Wat de aanbestedende dienst vraagt
The planned introduction of longer train services to the Airport in response to future demand growth will mean that double stacking arrangements of trains as currently used will no longer be viable. Through the project's Delivery Steering Group, Northern and TransPennine Express have carried out analysis which has identified that additional platform capacity is needed at the airport in order to realise the full benefit of longer train services serving the airport. The scheme is part of a package of proposed measures in the Manchester area that are being designed/planned to boost capacity and resilience, emanating from the Cross Manchester Capacity and Reliability Improvement Study. Improving the operation of train services in the centre of Manchester and providing further capacity at Manchester Airport station, aligns with the strategic aims of Network Rail, TfGM, TfN and the wider industry. This project in in Tranche 1 of the Manchester and North West Transformation Programme (MNTP): A remodelling of the station at Manchester Airport, specifically a platform addition or extension of multiple platforms, or provision of a new turnback facility, will be essential to accommodate the planned implementation of longer rolling stock services. The redevelopment of these platforms will enable permissive working of two 6x24m (144m) trains, in two of the four platforms at the Airport Station. This will allow for the unaltered retention of all existing TOC services both originating and terminating at the Airport Station under 'double-stacking' conditions. The scope areas for this package are as follows: - OLE Substructures & Foundations - King Post Retaining Walls - Ancillary Civils (Inclusive of but not limited to; Trough routes, small concrete foundations, UTX's and signage).
Taal van deze aankondiging: English. Titel en beschrijving tonen we precies zoals de aanbestedende dienst ze heeft gepubliceerd.
Source: CF · reference C4N120949485 · JSON