Out For Tender › Stany Zjednoczone › Maszyny przemysłowe
29--ACTUATOR,ELECTROMEC, IN REPAIR/MODIFICATION OF
- Zamawiający
- NAVSUP WEAPON SYSTEMS SUPPORT, Dept of Defense
- Kraj
- Stany Zjednoczone
- Kategoria
- Maszyny przemysłowe
- Termin składania ofert
- Kończy się jutro (28 Oct 2026 16:30 UTC-4)
- Opublikowano
- 23 Oct 2026
- Procedura
- Solicitation
Przeczytaj oficjalne ogłoszenie i złóż ofertę → Oferty składa się zawsze na portalu zamawiającego, nigdy tutaj.
Czego szuka zamawiający
CONTACT INFORMATION|4|N731.47|n00383|771-229-0615|ARIANNA.G.PILLA.CIV@US.NAVY.MIL| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|Invoice and Receiving Reports (combo)|Inspection site source final acceptance site source|TBD|N00383|TBD|TBD|See schedule|TBD||||||||| Terms & Conditions of BOA/LTC N0038322GZ901 apply. This contract/delivery order/purchase order/modification is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to issue this contract/delivery order/purchase order/modification. \ 1. SCOPE 1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document. 1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements. Repair of: ACTUATOR,ELECTROMEC ;2910016969261; NSN , ;826615-5 (73030); Part Number, Shall be performed IAW: ACTUATOR,ELECTROMEC ;Latest Rev.; Publication (s). 1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS The contractor shall maintain a quality control system which meets the requirements of Mil-I-45208A, Mil-Q 9858,ISO-9000 / 9001 / 9002 or equivalent. RESPONSIBILITY FOR INSPECTION: Unless otherwise specified, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified, the contractor may use his own or any other facility suitable for the performance of the inspection requirements specified herein. PROCEDURES:The contractor shall prepare and maintain Quality Control Documentation, test and repair procedures, and inspection procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of the test, repair, and inspection process, as well as the performance spcifications to perform the procedures. QUALITY ASSURANCE PROGRAM PLAN: The contractor shall develop, implement and maintain a Repair Quality Plan in compliance with the requirements of Mil-I-45208A, Mil-Q-9858, ISO,9000 / 9001 / 9002, or equvalent.The plan shall define the specific methods by which compliance with contractual requirements will be assured. All quality assurance data shall be provided to the Government for review and approval upon request. PURCHASED MATERIAL CONTROL: The contractor shall establish and maintain a system of control over purchased material which shall assure that the necessary requirements of this contract are included. in all sub contract agreements. A parts control system shall establish a record of performance for each purchased and internally manufactured part and shall be used to evaluate continued use of the source. The contractors control system shall be in compliance wil either Mil-I 45208A/Mil-Q-9858 or equivalent Quality Quality Assurance Standared.(ISO/AS:9000, 9001, 9002). RECEIVING INSPECTION OF PURCHASED MATERIAL: Purchased items shall be inspected upon receipt at the contractors facility to assure conformance with all requirements of the Technical Data Package (TDP). Evidence of such inspections shall be maintained for Government review at least twelve (12) months following acceptance of the end item. Inspection reports shall be maintained by the contractor. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria, such ascertifications, and actual dimensional readings. FAILURE ANALYSIS AND CORRECTIVE…
Język tego ogłoszenia: English. Tytuł i opis pokazujemy dokładnie tak, jak opublikował je zamawiający.
Source: SAM · reference N0038327QNA07 · JSON