Out For Tender

Out For Tender › Vereinigte Staaten › Laborgeräte, optische Geräte und Präzisionsgeräte (außer Gläser)

66--IRA - High-Temperature Chamber Furnace

This tender has closed. It stays online as a record of what was advertised.

Auftraggeber
NATIONAL ENERGY TECHNOLOGY LABORATORY, Energy, Department of
Land
Vereinigte Staaten
Kategorie
Laborgeräte, optische Geräte und Präzisionsgeräte (außer Gläser)
Frist
Beendet (16 Nov 2026 13:00 UTC-5)
Veröffentlicht
10 Nov 2026
Verfahren
Sources Sought

Offizielle Bekanntmachung lesen und bieten → Die Angebotsabgabe erfolgt immer auf dem Portal des Auftraggebers, niemals hier.

Was der Auftraggeber sucht

This amendment is to address several requests for clarifications associated with our Technical Specifications. Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system? A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system. Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel? A2: NETL is responsible for installing all necessary hardwire drops or disconnects. Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output? A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines. Q4. Lead Times and Compliance: Given that Brand Name or Equal highly customized vacuum furnaces built to NRTL, UL 508A, and NFPA 79 standards often have commercial lead times exceeding 6 to 9 months, will the anticipated RFQ allow for standard commercial lead times? Additionally, can you confirm if this procurement will be subject to the Trade Agreements Act (TAA) or strict Buy American Act (BAA) provisions? A4: NETL will accept standard commercial lead times for this procurement. This procurement will be subject to the FAR 52.225-5 Trade Agreements Act (TAA).

Sprache dieser Bekanntmachung: English. Titel und Beschreibung erscheinen genau so, wie der Auftraggeber sie veröffentlicht hat.

How this compares

  • This is one of 294 open tenders in Vereinigte Staaten for Laborgeräte, optische Geräte und Präzisionsgeräte (außer Gläser).
  • Bidders were given 6 days from publication to the deadline; the median for open tenders in Vereinigte Staaten is 25 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference 89243327NEX000003 · JSON