Out For Tender

Out For Tender › Stati Uniti › Attrezzature da laboratorio, ottiche e di precisione (escluso vetri)

66--IRA - High-Temperature Chamber Furnace

Stazione appaltante
NATIONAL ENERGY TECHNOLOGY LABORATORY, Energy, Department of
Paese
Stati Uniti
Categoria
Attrezzature da laboratorio, ottiche e di precisione (escluso vetri)
Scadenza
Scade oggi (16 Nov 2026 13:00 UTC-5)
Pubblicata
10 Nov 2026
Procedura
Sources Sought

Leggi il bando ufficiale e partecipa → La presentazione delle offerte avviene sempre sul portale della stazione appaltante, mai qui.

Che cosa richiede la stazione appaltante

This amendment is to address several requests for clarifications associated with our Technical Specifications. Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system? A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system. Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel? A2: NETL is responsible for installing all necessary hardwire drops or disconnects. Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output? A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines. Q4. Lead Times and Compliance: Given that Brand Name or Equal highly customized vacuum furnaces built to NRTL, UL 508A, and NFPA 79 standards often have commercial lead times exceeding 6 to 9 months, will the anticipated RFQ allow for standard commercial lead times? Additionally, can you confirm if this procurement will be subject to the Trade Agreements Act (TAA) or strict Buy American Act (BAA) provisions? A4: NETL will accept standard commercial lead times for this procurement. This procurement will be subject to the FAR 52.225-5 Trade Agreements Act (TAA).

Lingua di questo bando: English. Titolo e descrizione sono mostrati esattamente come pubblicati dalla stazione appaltante.

How this compares

  • This is one of 304 open tenders in Stati Uniti for Attrezzature da laboratorio, ottiche e di precisione (escluso vetri).
  • Bidders were given 6 days from publication to the deadline; the median for open tenders in Stati Uniti is 23 days.

More open tenders from this buyer

Similar open tenders

Source: SAM · reference 89243327NEX000003 · JSON