Out For Tender › États-Unis › Équipements de laboratoire, d'optique et de précision (excepté les lunettes)
66--IRA - High-Temperature Chamber Furnace
This tender has closed. It stays online as a record of what was advertised.
- Acheteur
- NATIONAL ENERGY TECHNOLOGY LABORATORY, Energy, Department of
- Pays
- États-Unis
- Catégorie
- Équipements de laboratoire, d'optique et de précision (excepté les lunettes)
- Date limite
- Clôturé (16 Nov 2026 13:00 UTC-5)
- Publié le
- 10 Nov 2026
- Procédure
- Sources Sought
Lire l'avis officiel et soumissionner → La soumission se fait toujours sur le portail de l'acheteur, jamais ici.
Ce que l'acheteur demande
This amendment is to address several requests for clarifications associated with our Technical Specifications. Q1. Facility Access and Rigging: The specifications require installation at the R&D plateau on the NETL Pittsburgh site. Does the specific facility have a loading dock capable of receiving standard freight, and is there a clear, at-grade, or freight-elevator-accessible path to the final installation room with adequate door clearances for a 100 kW system? A1: NETL has a clear path to the final installation area with adequate door clearances for a 100 kW system. Q2. Utility Proximity: The furnace requires a 480-volt, three-phase, 60 Hz power supply supporting an overall power of at least 100 kW. Is the necessary hardwire drop or disconnect already existing within the immediate footprint of the intended installation area, or will the contractor be responsible for routing power from a distant sub-panel? A2: NETL is responsible for installing all necessary hardwire drops or disconnects. Q3. Gas Supply and Exhaust: The system requires a fueled incinerator torch to combust organic outgassing. Will the Government supply the necessary process and sweep gases (e.g, Argon, Nitrogen, Propane/Natural gas) via existing facility lines, and is there an existing facility exhaust or fume hood integration point for the torch output? A3: NETL is responsible for installing all necessary gases, gas lines, and venting lines. Q4. Lead Times and Compliance: Given that Brand Name or Equal highly customized vacuum furnaces built to NRTL, UL 508A, and NFPA 79 standards often have commercial lead times exceeding 6 to 9 months, will the anticipated RFQ allow for standard commercial lead times? Additionally, can you confirm if this procurement will be subject to the Trade Agreements Act (TAA) or strict Buy American Act (BAA) provisions? A4: NETL will accept standard commercial lead times for this procurement. This procurement will be subject to the FAR 52.225-5 Trade Agreements Act (TAA).
Langue de cet avis : English. Le titre et la description sont affichés tels que publiés par l'acheteur.
How this compares
- This is one of 294 open tenders in États-Unis for Équipements de laboratoire, d'optique et de précision (excepté les lunettes).
- Bidders were given 6 days from publication to the deadline; the median for open tenders in États-Unis is 25 days.
More open tenders from this buyer
Brand Name or Equal NETZSCH Dil 502 Supreme
NATIONAL ENERGY TECHNOLOGY LABORATORY, Energy, Department of
66--Brand Name or Equal Teledyne Instruments Liquid Sy
NATIONAL ENERGY TECHNOLOGY LABORATORY, Energy, Department of
Brand Name or Equal Teledyne Instruments Liquid Sy
NATIONAL ENERGY TECHNOLOGY LABORATORY, Energy, Department of
Brand Name or Equal Across International 2R50f.110
NATIONAL ENERGY TECHNOLOGY LABORATORY, Energy, Department of
Similar open tenders
Keysight N1500A Materials Measurement Suite
NAVAL RESEARCH LABORATORY, Dept of Defense
Stock replenishment of stainless steel plates
NASA SHARED SERVICES CENTER, National Aeronautics and Space Administration
Rugged Spectrometers
W6QM MICC-FT DRUM, Dept of Defense
IPAD CASES AND SCREEN PROTECTORS
W6QM MICC-FT DRUM, Dept of Defense
Fluke Met/Cal and Met/Team Software and Hardware System Upgrade
FA2263 AFLCMC ROMK AFMETCAL, Dept of Defense
Source: SAM · reference 89243327NEX000003 · JSON